CASE STUDY

Mota-Engil/Vale – Mozambique

DXB Pump & Power was approached by a European mining focused buying house to supply twelve high flow pumpsets for an international mining company based in the Tete region of Mozambique and delivery was required in under three months. 

Whilst other pump manufacturers baulked at the short delivery period, DXB spoke with key suppliers such as Cornell Pump and Caterpillar, to identify whether this was possible and after confirmation, quoted the twelve pumpsets with three months delivery.

Following the successful tendering process, an order was placed on DXB Pump & Power with strict penalties as part of the finance agreement and the company immediately began the process of designing the pumpsets for Mota-Engil.

With twelve CAT and Perkins engines to be ordered and twelve pumps to source from Cornell on the West Coast of the USA, design time was limited to a single week so that orders could be placed swiftly to ensure on-time-delivery.

DXB Pump worked six days a week, twelve hours a day for six weeks to build all the pumpsets. They were required to be designed as trailers complete with suction booms, Storm & Stone protection systems and the safety equipment included fire extinguishers in addition to safety lighting.

All the pumpsets capable of over 500m³/hr at heads up to 100m were shipped on time and on budget for the mine to install and operate within the twelve-week time frame.

Client Requirements:

SUPPLY WITHIN 3 MONTHS

12 HIGH FLOW PUMPSETS

ROBUST BUILD OF MATERIALS

RELIABLE SUPPLIER WITH ZERO BREAKDOWNS

Gallery:

ENQUIRE TODAY

    Edit Template